Relocation of a live operation’s data center to a new site, with power continuity secured during and after the move.

Client
Corporate group data center
Location
Quito
Period
2020 – 2021
Solutions involved
Digital Infrastructure · Smart Building
Participation
Direct

Figures

Results that reflect the scope and scale of the project.

60 kWUPS in service
168batteries renewed
342U racks

Challenge

Move a live operation’s data center to a new site and keep it powered throughout.

What we did

  • Installation of 3 racks with 78 links between them.
  • Distribution board with bypass and 48 rack outlets.
  • Temporary 6 kVA UPS during the move.
  • 60,000 BTU precision cooling.
  • Maintenance and battery renewal of the 60 kW UPS.

Related projects

View all projects
Call center floor with workstations in a Quito office buildingWORK

Phased corporate call centers in an operating building

Fit-out of several call center floors in an operating corporate building, with network, power, security and furniture, without stopping operations.

Branch network rackWORK

Infrastructure for a nationwide branch network

Standardized network, telephony and video surveillance for branches across the country, with a logistics data center and monitoring center.

Montview+ building at duskBUILD

Electrical infrastructure for the Montview+ building

Complete electrical system for a 12-storey residential building with 2 basement levels (155 units and 11 retail spaces), from medium voltage to the meter panels, plus the design and implementation of its electronic systems.

Let's talk

Have a project?

Let's talk about your infrastructure requirements.